Wednesday, April 10, 2013

Day 10 - Touch Up Work

Installing the water to the plumbing today.

They were putting the final touches for water and sewer.

Day 9 - Garage partially filled

Yesterday, it appears as though things have slowed down a bit.  But for nine days, I am still impressed.

Sunday, April 7, 2013

The Elevation (E)

The house will look exactly like this but with a grey door and garage on the other side.



Friday, April 5, 2013

Appliances Chosen

We went with black over stainless steel because how it will flow with the cabinets and countertops. But now I'm thinking the stainless steel would have work as well. I wonder if they would let us switch. We tried adding a morning room after the fact, but that would have pushed our permit date further away.

Oven range

Double microwave oven

GE Double Door Refrigerator

Dishwasher

Double Walled Oven